One of the most typical questions we get asked at Agape, is how long does a remodel take? That can vary considerably depending on the type and scope of the remodel. Traditionally, you would interview and find an architect. Once the architect completes your design, you begin to search for contractors to do the build. At Agape, we are a Design Build Firm, meaning, we can do the entire process in-house. Typically, we end up completing the work earlier than if someone hired an architect and then a separate contractor.
Once you sign a design agreement with us, that is when the work begins. We start with the design and have an in-house Professional Engineer, Architect, drafting team and interior designers. Our drafting team starts by visiting the home to take as-built measurements which we then bring to life as a detailed 3D model in Revit.


Our architect then gets to work creating the design for the project. The design team collaborates with the homeowners, bringing their vision to life. Once the design is complete, our Project Consultants reach out to our sub-contractors and suppliers for bidding.

St. Louis County Permits
Another common question asked is whether a remodel will require permits. If your home project requires moving any mechanical, electrical or plumbing components, it will require permits. Technically, anything over a square foot of drywall repair needs a permit. At Agape, we take pride in doing things correctly and we will get all your necessary permits. Agape has experience working with every municipality in St. Louis County and the City of St. Louis to acquire building permits.. If you do a remodel that should have had a permit, and you didn’t get one, it can come back to haunt you later when you try to sell or do an additional remodel.
Our interior design team is also working with the client at this stage, helping them choose the ideal finishes for their project and budget. With these decisions made, we can have them ordered and ready to go so that nothing holds up the construction process.

The whole design / permit process takes about 2-3 months.
Once construction begins, the timeline will depend on the scope of the project. For example, a gut kitchen remodel that is keeping the same floor plan should take 4-8 weeks. However, a remodel that includes removing walls, moving plumbing, or building an addition will take longer.